
The Residences at East Milton
PROJECT NEWS:
The Residences at East Milton was approved by the Board of Appeals in April 2022.
Construction will begin in early 2025. Details and construction updates will continue to be posted on this website. If you would like to receive updates via email, please join our mailing list.
8/1/2025
Project Update #7
Full repaving of the alleyway, including the installation of underground power lines, is currently underway. As of right now, we are on track to finish by 8/12 as anticipated. We appreciate your patience and cooperation as this work continues. Please use alternate access routes where necessary and remain cautious around work zones.
If you have any questions or concerns, please reach out to us.
Thank you for your understanding as we make these lasting improvements!
7/15/2025
Project Update #6
This is a reminder that Franklin Street is now a one-way street. This change is already in effect. Updated signage is posted to reflect the current traffic pattern. All residents and visitors should follow posted directions when approaching the area.
Additionally, many inquiries have been received regarding when applications and move-in dates will be released. Listed below are some general answers:
Frequently Asked Questions
Application Period
Applications are expected to open starting in 2027. Market-rate units will be pre-leased on a first come, first served basis.
Due to high demand, there will be a lottery for affordable units. The Residences at East Milton will have a 60-day open enrollment period during which applicants can submit completed applications at any time during the period. At the end of this open enrollment period, a public lottery will be held to select the initial applicants for the 23 affordable apartments.
The lottery process will be advertised to our mailing list as well as to various local media and civic organizations.
Move-In Timeline
We anticipate that first move-ins will begin in summer of 2027, pending final approvals.
Available Amenities
Underground parking
Surface parking
In-unit washer and dryer
Fitness center
Roof deck
5/29/2025
Project Update #5
Trucking operations start next week, 6/2/2025, and will be coordinated to avoid traffic disruptions. All loading will occur within the fenced construction zone. If necessary, police detail will be present.
3/31/2025
Project Update #4
Abatement has been completed for all structures onsite and demolition permits have been issued.
Demolition is scheduled to begin tomorrow, 4/1/2025. The crew will begin demo for the houses on Bassett Street before moving on to the office building at 4 Franklin.
All of this work will be contained within the boundaries of the site.
3/20/2025
Project Update #3
Happy Spring and happy (belated) St. Patrick’s Day to all.
We are wrapping up abatement on the site this week and intend to begin demolition during the week of 3/24/25.
1/24/2025
Project Update #2
Construction fencing will be going up around the perimeter of the property on Monday 1/27 and Tuesday 1/28.
We will begin abatement of the buildings on Monday 2/3.
We anticipate starting demolition in February, after the abatement is completed. Dates will be posted here once finalized.
12/17/2024
Project Update #1
On Wednesday 12/18 and Thursday 12/19, geotechnical engineers will be drilling on the site to collect soil samples. All work will be contained to the job site and any disruption to traffic will be minimal.
New housing solutions for neighbors to live in Milton with walkable access to the amenities of East Milton Square - creating a village experience in the heart of town.
By the Numbers:
92 units total
14 studios
38 one-bedroom
30 two-bedroom
10 three-bedroom
104 parking spaces
67 garage spaces
37 surface spaces
A Local Team with Local Values
The development team is a joint venture between the Falconi Companies and the Joseph J. Corcoran Company, two family-run businesses that call Milton home. Together, combining generations of collective experience, we will deliver a project that our town can be proud of.
Since 2015 the town has been studying where and how to improve housing solutions while also improving and activating the main commercial retail district in East Milton Square - both the Master Plan and the subsequent Urban Land Institute Study recommend increased density in the Square - As development is inevitable - our local team engaged in an effort to implement the recommendations from these studies and realize the vision set out for East Milton.
We are committed to working with the community to achieve our shared goals, including:
Increased housing options for those looking to call Milton home or those who are looking for an opportunity to stay.
Providing the town with a feasible project to realize the vision set out in our 2015 Master Plan
Improving the experience and opportunity for businesses, shops and restaurants in the square
Plan Highlights
Improved Public Realm
Activate Adams Court as a true pedestrian walkway, connecting the Milton Marketplace to Adams Street and the new and improved Manning Community Park.
Update sidewalks and pedestrian experience along Bassett Street & Franklin Street.
Thoughtful Design
Widened sidewalks, beautiful landscaping, and community seating along Bassett Street.
Our architect, DiMella Shaffer, is a local firm that cares deeply, designs passionately, listens energetically and partners creatively to find elegant solutions to complex challenges.
Significant Progress Towards Housing Goals
Chapter 40B mandates that Massachusetts cities and towns provide at least 10% of their housing stock designated as affordable— for Milton, that should be 964 units, but the town currently only has 481 units (5%) on the Subsidized Housing Inventory (SHI).
All units in this development would count towards Milton’s affordable housing need, for almost 1% on the SHI.