0
Skip to Content
Residences at East Milton Square
Construction
The Project
Further Reading
Mailing List
Contact Us
Residences at East Milton Square
Construction
The Project
Further Reading
Mailing List
Contact Us
Construction
The Project
Further Reading
Mailing List
Contact Us

Further Reading

 

Project Documents

Draft Construction Management Plan submitted in 2021

  • Scroll to page 52 for CMP

  • Final CMP will be posted here once it is finalized with the Town Engineer & Building Department

In The Media

Linda Champion Column: Quality Housing In East Milton is needed and will aid business (Originally published in the Patriot Ledger)

“Milton 40B proposal wins key go-ahead” (Patriot Ledger, September 2020))

“East Milton project heads to appeals board” (Milton Times, September 2020)

Studies & Reports

“Looking Forward: East Milton Square” Vision Plan Produced by Barrett Planning Group (2021)

Milton Housing Production Plan (2020)

Urban Land Institute Technical Assistance Panel Report (2019)

Milton Master Plan (2015): Volume I: Presenting the Plan, Volume II: Inventory, Volume III: Public Process

East Milton Square Parking and Access Study (2011)

Chapter 40B Fact Sheet (2011)

Chapter 40R Information (2018)

The Boston Housing Report Card (2019)

On The Ground: 40B Developments Before & After (2009)

Questions or comments?

Email us